FURRER+FREY Down Under

Austbreck have delivered the following Rigid and Retractable Conductor Rail System at the following location:

  • 2007 – Auburn – Reliance Rail Train Maintenance Depot – 6 x Retractable Conductor Rail System
  • 2012/2013 – Perth – Citilink tunnel – 2 x 600m Solid Conductor Rail System
  • 2013 – Britomart Auckland Railway System – 5 x 200m Solid Conductor Rail System
  • 2013 – Auckland tunnels at Puwera – 2 x 120m Solid Conductor Rail System
  • 2013 – Auckland tunnels at Parnell – 2 x 120m Solid Conductor Rail System
  • 2014 – Hornsby Train Maintenance Depot – 1 x 50m Retractable Conductor Rail System